020-32372563
Second generation underwater dredging robot-JD-02
Second generation underwater dredging robot-JD-02
Second generation underwater dredging robot-JD-02
Once the rain or water flow is large, easy to cause blockage, the city of serious water, underwater silt removal robot silt removal barrier reliability, silt removal safety effect is good! Application
Once the rain or water flow is large, easy to cause blockage, the city of serious water, underwater silt removal robot silt removal barrier reliability, silt removal safety effect is good!

Project Case: Longgang Underwater Dredging Project (as shown in the following picture and video)


Project Case: Longgang Underwater Dredging Project (as shown in the following picture and video)

1.jpg


2.jpg


陕西龙钢水下清淤2.jpg


陕西龙钢水下清淤.jpg


陕西龙钢水下清淤3.jpg





ABOUT US     BUSSINESS     CASE     NEWS     RECRUITMENT     CONTACT  US

Addressrooms 13, 14 and 15, 24th floor, No.68 gangwan road, huangpu district, guangzhou

Contact: Mr. Miao +8613318838881 Ms.Lu+8618022346003

Phone:020-32372563

E-mail:gzjiangda@126.com

QQ:496040640